<th id="bpyfw"></th>
    1. <th id="bpyfw"><big id="bpyfw"><video id="bpyfw"></video></big></th>
      <em id="bpyfw"><strike id="bpyfw"><u id="bpyfw"></u></strike></em>

      Baku- Tibilisi - Ceyhan Crude Oil Pipeline Project-Turkey

      General Project’s Data

      Total Project value: 1,7 Billion USD
      Total Length of Pipeline: 1.075.366 m.
      Pipe Diameters: 46” – 42” - 34”
      Total Pump Stations: 6 pieces (4 pieces Main Pump Stations, 2 pieces of Pig Stations)
      Block Valve Stations: 51 pieces
      Total excavation: 15.580.540 m3
      Total backfilling: 8.313.622 m3
      Total concrete: 112.000 m3
      Total workmanship: 12.074 ki?i